DoD (Indirect)
Transmission, Distribution, Substation, Protection & Control,
and Power Generation
![](https://svxb96.p3cdn1.secureserver.net/wp-content/uploads/2021/05/icon-transmission.png)
![](https://svxb96.p3cdn1.secureserver.net/wp-content/uploads/2021/05/icon-distribution.png)
![](https://svxb96.p3cdn1.secureserver.net/wp-content/uploads/2021/05/icon-substation.png)
![](https://svxb96.p3cdn1.secureserver.net/wp-content/uploads/2021/05/icon-power-and-generation.png)
Project:
Multiple Projects
Project Location:
Confidential
Scope of Work:
In this multi-pronged project for the DoD, AES provided a variety of services.
- EPC services for new fiber trunk onsite
- A substation upgrade, relay addition and replacement of the SCADA system, plus NETA testing
- Systems integration consisting of a full SCADA package to communicate to the substation automation controller
- Use the best safety, production, processes, equipment and tools to make it happen
- Engineering and design for a new 13.8kV electrical distribution line interconnecting a new cogeneration plant switchgear to the existing campus distribution network